| www.ClassicTW.com https://mail.black-squirrel.com/ |
|
| thereverend.org going offline 8/22 https://mail.black-squirrel.com/viewtopic.php?f=1&t=22809 |
Page 1 of 1 |
| Author: | the reverend [ Tue Aug 18, 2009 10:09 am ] |
| Post subject: | thereverend.org going offline 8/22 |
thereverend.org twgs will go offline 8/22 for at least two months, perhaps longer. sorry for the outtage; we're moving into a new house that needs a bit of renovation before operations can resume. i will announce the re-opening in this forum. |
|
| Author: | Promethius [ Tue Aug 18, 2009 11:58 am ] |
| Post subject: | Re: thereverend.org going offline 8/22 |
the reverend wrote: thereverend.org twgs will go offline 8/22 for at least two months, perhaps longer. sorry for the outtage; we're moving into a new house that needs a bit of renovation before operations can resume. i will announce the re-opening in this forum. Good luck on the renov and esp if you are dealing with contractors that do the work. I've been working with 3 seperate contractors on my house for a few months now and it is "interesting". Waiting now on AT&T to make some upgrades on the wiring and Internet service that should be done tomorrow (hopefully a bit faster and more reliable). All it takes is $$$$$.$$ and time - too much of each. |
|
| Author: | the reverend [ Thu Aug 20, 2009 10:49 am ] |
| Post subject: | Re: thereverend.org going offline 8/22 |
Promethius wrote: Good luck on the renov and esp if you are dealing with contractors that do the work. I've been working with 3 seperate contractors on my house for a few months now and it is "interesting". Waiting now on AT&T to make some upgrades on the wiring and Internet service that should be done tomorrow (hopefully a bit faster and more reliable). All it takes is $$$$$.$$ and time - too much of each. the basement was literally unfinished by the previous owner. by that i mean, once it was finished, but they "unfinished" it. so i have to do some more demolition and remove the cruddy wood paneling, move a wall about two feet over, and put up drywall and flooring. there is a rough-in for a bathroom, but we'll put that in later. fortunately i have a friend who runs his own restoration outfit. hiring a friend can be a double-edged sword, but i trust his integrity, so we'll have a go at it. i'm actually excited because this is the first time i'll own a home that i'll actually get to customize. (we didn't modify the previous two homes we've owned.) i'm going to wire the walls in the basement for a home theater and ethernet. i'll also be able to push ethernet to some rooms upstairs. it's gonna be sweet. |
|
| Author: | mob [ Thu Aug 20, 2009 4:12 pm ] |
| Post subject: | Re: thereverend.org going offline 8/22 |
Uhggg....sounds likes work:P HEHE...good luck with everything rev.. |
|
| Author: | the reverend [ Sat Aug 22, 2009 3:59 pm ] |
| Post subject: | Re: thereverend.org going offline 8/22 |
going offline in 3 2 1 |
|
| Page 1 of 1 | All times are UTC - 5 hours |
| Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group http://www.phpbb.com/ |
|